MAITUM Quality Plots


Site Overview | Quality Plots | File Summary | File Availability


Cycle Slips Per 1000 Observations (Total):

Less than 22.0 cycle slips per 1000 observations indicates normal operation.

MP1 (Overall):

RMS multipath error on L1 should be less than 0.5m

Overall Data Completeness:

More than 94% complete epochs/observations indicates normal operation.

Number of Satellites (Total):

The number of satellites should be 5 or greater for high accuracy positioning.


Last Modified: 21/11/24 08:28:20 (UT+8.0)

This page was generated by Leica SpiderQC 7.7.0.9062.